  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "tremie-concrete-displacement-calculator",
  "category": "heavy-civil",
  "title": "Tremie Pipe Safe Withdrawal & Embedment Calculator",
  "description": "Check how far a tremie pipe can safely be raised during an underwater or drilled-shaft concrete pour without breaking the required embedment seal.",
  "url": "https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/tremie-concrete-displacement-calculator.json",
  "inputCount": 3,
  "testCaseCount": 2,
  "sourceCount": 1,
  "lastVerified": "2026-09-02",
  "translations": {
    "es-US": "https://craftquantities.com/es/calculators/heavy-civil/tremie-concrete-displacement-calculator/"
  },
  "citation": {
    "author": "Craft Quantities",
    "title": "Tremie Pipe Safe Withdrawal & Embedment Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-02",
    "url": "https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Tremie Pipe Safe Withdrawal & Embedment Calculator. Version 1.0.1. Sources checked 2026-09-02. https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/",
      "apa": "Craft Quantities. (2026). Tremie Pipe Safe Withdrawal & Embedment Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/",
      "harvard": "Craft Quantities (2026) Tremie Pipe Safe Withdrawal & Embedment Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/",
      "bibtex": "@misc{craftquantities-calculators-heavy-civil-tremie-concrete-displacement-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Tremie Pipe Safe Withdrawal & Embedment Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/heavy-civil/tremie-concrete-displacement-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "pourAreaM2",
      "label": "Pour Cross-Sectional Area",
      "type": "number",
      "dimension": "area",
      "defaultValue": 1.5,
      "min": 0.01,
      "max": 50,
      "step": 0.1,
      "help": "The horizontal cross-sectional area of the shaft or excavation being poured."
    },
    {
      "id": "currentPourDepth",
      "label": "Current Concrete Depth Placed",
      "type": "number",
      "dimension": "length",
      "defaultValue": 3,
      "min": 0,
      "max": 60,
      "step": 0.1,
      "help": "How deep the concrete already placed currently measures, from the base of the pour."
    },
    {
      "id": "tremiePipeLength",
      "label": "Total Tremie Pipe Length",
      "type": "number",
      "dimension": "length",
      "defaultValue": 10,
      "min": 0.01,
      "max": 100,
      "step": 0.5,
      "help": "The full length of the tremie pipe currently in the shaft."
    }
  ],
  "sources": [
    {
      "label": "Standard tremie placement practice requires the pipe's discharge end to stay embedded at least 1.5 m (5 ft) into the already-placed concrete at all times, so new concrete displaces water or slurry upward without washout or contamination of the mix"
    }
  ],
  "testCases": [
    {
      "name": "1.5m² area, 3m placed, 10m pipe",
      "inputs": {
        "pourAreaM2": 1.5,
        "currentPourDepth": 3,
        "tremiePipeLength": 10
      },
      "expected": 1.5,
      "toleranceDecimalPlaces": 1,
      "unit": "m of pipe safely withdrawable",
      "confidence": "high",
      "steps": [
        {
          "label": "Concrete volume placed so far",
          "value": 4.5,
          "unit": "m³"
        },
        {
          "label": "Remaining pipe length above pour surface",
          "value": 7,
          "unit": "m"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    },
    {
      "name": "2m² area, 1m placed, 12m pipe (unsafe)",
      "inputs": {
        "pourAreaM2": 2,
        "currentPourDepth": 1,
        "tremiePipeLength": 12
      },
      "expected": -0.5,
      "toleranceDecimalPlaces": 2,
      "unit": "m of pipe safely withdrawable",
      "confidence": "low",
      "steps": [
        {
          "label": "Concrete volume placed so far",
          "value": 2,
          "unit": "m³"
        },
        {
          "label": "Remaining pipe length above pour surface",
          "value": 11,
          "unit": "m"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    }
  ]
}