{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "screed-thickness-calculator",
  "category": "materials-quantities",
  "title": "Floor Screed Thickness Calculator — Bonded, Unbonded and Floating",
  "description": "How thick a bonded, unbonded or floating sand and cement screed must be for its duty and a base out of level, with the sand, cement and bags it takes.",
  "url": "https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/screed-thickness-calculator.json",
  "inputCount": 4,
  "testCaseCount": 4,
  "sourceCount": 8,
  "lastVerified": "2026-10-05",
  "citation": {
    "author": "Craft Quantities",
    "title": "Floor Screed Thickness Calculator — Bonded, Unbonded and Floating",
    "version": "1.1.0",
    "sourcesChecked": "2026-10-05",
    "url": "https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Floor Screed Thickness Calculator — Bonded, Unbonded and Floating. Version 1.1.0. Sources checked 2026-10-05. https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/",
      "apa": "Craft Quantities. (2026). Floor Screed Thickness Calculator — Bonded, Unbonded and Floating (Version 1.1.0) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/",
      "harvard": "Craft Quantities (2026) Floor Screed Thickness Calculator — Bonded, Unbonded and Floating (Version 1.1.0). Available at: https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-screed-thickness-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Floor Screed Thickness Calculator — Bonded, Unbonded and Floating},\n  version      = {1.1.0},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "floorArea",
      "label": "Floor area",
      "type": "number",
      "dimension": "area",
      "defaultValue": 60,
      "min": 0.5,
      "max": 20000,
      "step": 1,
      "help": "The area being screeded."
    },
    {
      "id": "screedType",
      "label": "How the screed sits on the floor",
      "type": "select",
      "defaultValue": "floating-c",
      "options": [
        {
          "value": "bonded",
          "label": "Bonded — stuck to the slab"
        },
        {
          "value": "unbonded",
          "label": "Unbonded — on a membrane or separating layer"
        },
        {
          "value": "floating-c",
          "label": "Floating on insulation — light duty, Category C (domestic)"
        },
        {
          "value": "floating-ab",
          "label": "Floating on insulation — medium and heavy duty, Categories A and B"
        }
      ],
      "help": "Bonded to the slab, separated from it by a membrane, or floating on insulation."
    },
    {
      "id": "baseDeviation",
      "label": "How far the base is out of level",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.01,
      "min": 0,
      "max": 0.075,
      "step": 0.001,
      "help": "The difference between the highest and lowest point of the base."
    },
    {
      "id": "wastePercent",
      "label": "Waste allowance",
      "type": "number",
      "defaultValue": 10,
      "min": 0,
      "max": 40,
      "step": 1,
      "help": "Percentage added for overfill, spillage and part batches."
    }
  ],
  "sources": [
    {
      "label": "BS 8204-1 gives a minimum thickness of 25 mm for a bonded levelling screed and 50 mm for an unbonded one, and splits floating screeds by duty category: 65 mm for light duty and domestic work (Category C), and 75 mm for medium and heavy duty (Categories A and B)"
    },
    {
      "label": "The standard distinguishes that MINIMUM from a SPECIFIED thickness for the drawing: a bonded screed is normally specified at 40 mm with a tolerance of ±15 mm, and an unbonded screed at a specified minimum of 70 mm. The ±15 mm on a 40 mm bonded screed is exactly the 25 mm minimum plus an allowance for the base not being flat, which is why this page takes the greater of the standard's nominal and the minimum plus your own measured deviation"
    },
    {
      "label": "BS 8204-1 flags a high risk of curling in unbonded and floating levelling screeds, and recommends they be either reinforced across the joints or made 100 mm or more thick"
    },
    {
      "label": "For heavy commercial traffic, or point loads above about 3.0 kN/m², published guidance on the standard adds a further 10 mm to 15 mm to a floating screed's depth over the Category A and B figure"
    },
    {
      "label": "Drying is the trade rule of thumb — roughly a day per millimetre for the first 50 mm and slower beyond it, in still, heated conditions — rather than a standard, and only a hygrometer reading on the floor settles it"
    },
    {
      "label": "Mineral Products Association, MPA Mortar Data Sheet 22, Screeds (Issue 3, October 2023), reporting BS 8204-1: nominal proportions by weight of cement to fine aggregate of 1:4, with a lower limit of 1:3 and an upper limit of 1:4.5 — the 1:4 by weight this page works the cement and sand at; a specification that names a ratio governs over it",
      "url": "https://www.mortar.org.uk/MPAMortar/media/Mortar/Publications/Datasheets/MPA-Mortar-Data-Sheet-22.pdf"
    },
    {
      "label": "Sika, SikaScreed-40 Binder product data sheet (Version 04.01, February 2026): 400 kg of binder per m³ of fresh mortar at 1:4 with the sand by weight (4 bags of 20 kg to about 320 kg of aggregate in a 200 litre mixer), 2,000 kg of material as batched in each cubic metre — the figure this page and the floor screed page both turn a volume of screed into cement and sand with",
      "url": "https://deu.sika.com/content/dam/dms/deaddconst01/6/sikascreed-40-binder.pdf"
    },
    {
      "label": "QUIKRETE Portland Cement (No. 1124) data sheet (revised August 2022): sold in 94 lb (42.6 kg) bags, among other sizes — the US sack this page counts",
      "url": "https://www.quikrete.com/PDFs/DATA_SHEET-PortlandCement.pdf"
    }
  ],
  "testCases": [
    {
      "name": "60 m² floating Category C over a base 10 mm out",
      "inputs": {
        "floorArea": 60,
        "screedType": "floating-c",
        "baseDeviation": 0.01,
        "wastePercent": 10
      },
      "expected": 2.95,
      "toleranceDecimalPlaces": 1,
      "unit": "in",
      "confidence": "medium",
      "steps": [
        {
          "label": "Minimum at any point",
          "value": 2.5590551181102366,
          "unit": "in"
        },
        {
          "label": "Minimum plus this base's deviation",
          "value": 2.952755905511811,
          "unit": "in"
        },
        {
          "label": "Screed volume after waste",
          "value": 174.80760027136853,
          "unit": "ft³"
        },
        {
          "label": "Cement by weight",
          "value": 1980,
          "unit": "kg"
        },
        {
          "label": "94 lb cement sacks",
          "value": 47,
          "unit": "sacks"
        },
        {
          "label": "Sharp sand by weight",
          "value": 7.92,
          "unit": "t"
        },
        {
          "label": "Rough drying time before a covering",
          "value": 100,
          "unit": "days"
        }
      ],
      "basis": "ambiguous"
    },
    {
      "name": "bonded on a flat slab takes the standard's 40 mm nominal, not its 25 mm minimum",
      "inputs": {
        "floorArea": 20,
        "screedType": "bonded",
        "baseDeviation": 0,
        "wastePercent": 10
      },
      "expected": 1.57,
      "toleranceDecimalPlaces": 1,
      "unit": "in",
      "confidence": "high",
      "steps": [
        {
          "label": "Minimum at any point",
          "value": 0.9842519685039371,
          "unit": "in"
        },
        {
          "label": "Nominal on the drawing",
          "value": 1.5748031496062993,
          "unit": "in"
        },
        {
          "label": "Minimum plus this base's deviation",
          "value": 0.9842519685039371,
          "unit": "in"
        },
        {
          "label": "Screed volume after waste",
          "value": 31.076906714909963,
          "unit": "ft³"
        },
        {
          "label": "Cement by weight",
          "value": 352.00000000000006,
          "unit": "kg"
        },
        {
          "label": "94 lb cement sacks",
          "value": 9,
          "unit": "sacks"
        },
        {
          "label": "Sharp sand by weight",
          "value": 1.4080000000000001,
          "unit": "t"
        },
        {
          "label": "Rough drying time before a covering",
          "value": 40,
          "unit": "days"
        }
      ],
      "basis": "ambiguous"
    },
    {
      "name": "heavy duty floating over a base 25 mm out",
      "inputs": {
        "floorArea": 400,
        "screedType": "floating-ab",
        "baseDeviation": 0.025,
        "wastePercent": 10
      },
      "expected": 3.94,
      "toleranceDecimalPlaces": 1,
      "unit": "in",
      "confidence": "medium",
      "steps": [
        {
          "label": "Minimum at any point",
          "value": 2.952755905511811,
          "unit": "in"
        },
        {
          "label": "Minimum plus this base's deviation",
          "value": 3.9370078740157486,
          "unit": "in"
        },
        {
          "label": "Screed volume after waste",
          "value": 1553.845335745498,
          "unit": "ft³"
        },
        {
          "label": "Cement by weight",
          "value": 17600,
          "unit": "kg"
        },
        {
          "label": "94 lb cement sacks",
          "value": 413,
          "unit": "sacks"
        },
        {
          "label": "Sharp sand by weight",
          "value": 70.4,
          "unit": "t"
        },
        {
          "label": "Rough drying time before a covering",
          "value": 150,
          "unit": "days"
        }
      ],
      "basis": "ambiguous"
    },
    {
      "name": "unbonded on a good base takes the 70 mm nominal over the 50 mm minimum",
      "inputs": {
        "floorArea": 100,
        "screedType": "unbonded",
        "baseDeviation": 0.005,
        "wastePercent": 10
      },
      "expected": 2.76,
      "toleranceDecimalPlaces": 1,
      "unit": "in",
      "confidence": "medium",
      "steps": [
        {
          "label": "Minimum at any point",
          "value": 1.9685039370078743,
          "unit": "in"
        },
        {
          "label": "Nominal on the drawing",
          "value": 2.755905511811024,
          "unit": "in"
        },
        {
          "label": "Minimum plus this base's deviation",
          "value": 2.1653543307086616,
          "unit": "in"
        },
        {
          "label": "Screed volume after waste",
          "value": 271.92293375546217,
          "unit": "ft³"
        },
        {
          "label": "Cement by weight",
          "value": 3080.0000000000005,
          "unit": "kg"
        },
        {
          "label": "94 lb cement sacks",
          "value": 73,
          "unit": "sacks"
        },
        {
          "label": "Sharp sand by weight",
          "value": 12.320000000000002,
          "unit": "t"
        },
        {
          "label": "Rough drying time before a covering",
          "value": 90,
          "unit": "days"
        }
      ],
      "basis": "ambiguous"
    }
  ]
}
