{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "reservoir-drawdown-time-calculator",
  "category": "sustainability-compliance",
  "title": "Permeable Reservoir Drawdown Time Calculator",
  "description": "How long an aggregate stormwater reservoir takes to drain into the subgrade at the design infiltration rate, beside the drawdown limit your manual sets.",
  "url": "https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/reservoir-drawdown-time-calculator.json",
  "inputCount": 7,
  "testCaseCount": 2,
  "sourceCount": 3,
  "lastVerified": "2026-08-30",
  "citation": {
    "author": "Craft Quantities",
    "title": "Permeable Reservoir Drawdown Time Calculator",
    "version": "1.0.0",
    "sourcesChecked": "2026-08-30",
    "url": "https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Permeable Reservoir Drawdown Time Calculator. Version 1.0.0. Sources checked 2026-08-30. https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/",
      "apa": "Craft Quantities. (2026). Permeable Reservoir Drawdown Time Calculator (Version 1.0.0) [Web calculator]. Retrieved from https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/",
      "harvard": "Craft Quantities (2026) Permeable Reservoir Drawdown Time Calculator (Version 1.0.0). Available at: https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/",
      "bibtex": "@misc{craftquantities-calculators-sustainability-compliance-reservoir-drawdown-time-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Permeable Reservoir Drawdown Time Calculator},\n  version      = {1.0.0},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "reservoirDepth",
      "label": "Aggregate Reservoir Depth",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.45,
      "min": 0.1,
      "max": 1.5,
      "step": 0.025,
      "help": "Depth of the open-graded storage layer, measured from the subgrade up to the top of the reservoir stone."
    },
    {
      "id": "voidRatio",
      "label": "Aggregate Void Ratio",
      "type": "number",
      "defaultValue": 0.4,
      "min": 0.2,
      "max": 0.45,
      "step": 0.01,
      "help": "Fraction of the reservoir layer that is open void space rather than stone."
    },
    {
      "id": "measuredInfiltrationRate",
      "label": "Measured Subgrade Infiltration Rate (mm/hr)",
      "type": "number",
      "defaultValue": 12,
      "min": 0.5,
      "max": 300,
      "step": 0.5,
      "help": "Field-measured rate at the excavation bottom, before any safety factor is applied (1 in/hr is 25.4 mm/hr)."
    },
    {
      "id": "safetyFactor",
      "label": "Design Safety Factor on the Measured Rate",
      "type": "number",
      "defaultValue": 2,
      "min": 1,
      "max": 10,
      "step": 0.25,
      "help": "Divisor applied to the measured rate to obtain the design rate, as required by the governing manual."
    },
    {
      "id": "underdrain",
      "label": "Underdrain",
      "type": "select",
      "defaultValue": "none",
      "options": [
        {
          "value": "none",
          "label": "None — full infiltration section"
        },
        {
          "value": "present",
          "label": "Underdrain fitted at a raised invert"
        }
      ],
      "help": "Whether a perforated underdrain relieves the upper part of the reservoir."
    },
    {
      "id": "underdrainInvertHeight",
      "label": "Underdrain Invert Height Above Subgrade",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.15,
      "min": 0.02,
      "max": 1,
      "step": 0.01,
      "help": "Height of the pipe invert above the subgrade — everything below this line can only leave by infiltrating."
    },
    {
      "id": "permittedDrawdownHours",
      "label": "Permitted Maximum Drawdown (hours)",
      "type": "number",
      "defaultValue": 48,
      "min": 6,
      "max": 120,
      "step": 1,
      "help": "The longest drawdown the governing manual allows for this system."
    }
  ],
  "sources": [
    {
      "label": "ASTM D3385, Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, is one accepted way of measuring the subgrade rate; the measurement is taken at the elevation of the finished excavation, not at the ground surface"
    },
    {
      "label": "The safety factor applied to the measured rate and the permitted maximum drawdown time are both set by the governing stormwater manual, which is why both are entered here rather than supplied by this page"
    },
    {
      "label": "Drawdown time = depth of stored water divided by the design infiltration rate; the stored water depth is the aggregate depth multiplied by its void ratio, since only the voids hold water"
    }
  ],
  "testCases": [
    {
      "name": "450 mm reservoir, 0.4 voids, 12 mm/hr measured, factor 2, no underdrain",
      "inputs": {
        "reservoirDepth": 0.45,
        "voidRatio": 0.4,
        "measuredInfiltrationRate": 12,
        "safetyFactor": 2,
        "underdrain": "none",
        "underdrainInvertHeight": 0.15,
        "permittedDrawdownHours": 48
      },
      "expected": 30,
      "toleranceDecimalPlaces": 3,
      "unit": "hours",
      "confidence": "medium",
      "steps": [
        {
          "label": "Design infiltration rate after the safety factor",
          "value": 6,
          "unit": "mm/hr"
        },
        {
          "label": "Depth of stored water that must infiltrate",
          "value": 180,
          "unit": "mm"
        },
        {
          "label": "Permitted maximum drawdown",
          "value": 48,
          "unit": "hours"
        },
        {
          "label": "Margin against the permitted maximum",
          "value": 18,
          "unit": "hours"
        }
      ],
      "basis": "ambiguous"
    },
    {
      "name": "600 mm reservoir with an underdrain at 200 mm, 0.35 voids, 25 mm/hr, factor 2.5",
      "inputs": {
        "reservoirDepth": 0.6,
        "voidRatio": 0.35,
        "measuredInfiltrationRate": 25,
        "safetyFactor": 2.5,
        "underdrain": "present",
        "underdrainInvertHeight": 0.2,
        "permittedDrawdownHours": 48
      },
      "expected": 7,
      "toleranceDecimalPlaces": 3,
      "unit": "hours",
      "confidence": "medium",
      "steps": [
        {
          "label": "Design infiltration rate after the safety factor",
          "value": 10,
          "unit": "mm/hr"
        },
        {
          "label": "Depth of stored water that must infiltrate",
          "value": 70,
          "unit": "mm"
        },
        {
          "label": "Permitted maximum drawdown",
          "value": 48,
          "unit": "hours"
        },
        {
          "label": "Margin against the permitted maximum",
          "value": 41,
          "unit": "hours"
        }
      ],
      "basis": "ambiguous"
    }
  ]
}
