{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "permeable-joint-fill-stone-calculator",
  "category": "materials-quantities",
  "title": "Permeable Pavement Joint Fill Stone Calculator",
  "description": "Jointing stone for a permeable pavement: the first fill, the top-up the joints take during compaction, and what each later replenishment round needs.",
  "url": "https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/permeable-joint-fill-stone-calculator.json",
  "inputCount": 6,
  "testCaseCount": 2,
  "sourceCount": 3,
  "lastVerified": "2026-08-30",
  "citation": {
    "author": "Craft Quantities",
    "title": "Permeable Pavement Joint Fill Stone Calculator",
    "version": "1.0.0",
    "sourcesChecked": "2026-08-30",
    "url": "https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Permeable Pavement Joint Fill Stone Calculator. Version 1.0.0. Sources checked 2026-08-30. https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/",
      "apa": "Craft Quantities. (2026). Permeable Pavement Joint Fill Stone Calculator (Version 1.0.0) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/",
      "harvard": "Craft Quantities (2026) Permeable Pavement Joint Fill Stone Calculator (Version 1.0.0). Available at: https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-permeable-joint-fill-stone-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Permeable Pavement Joint Fill Stone Calculator},\n  version      = {1.0.0},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "laidArea",
      "label": "Laid Pavement Area",
      "type": "number",
      "dimension": "area",
      "defaultValue": 100,
      "min": 1,
      "max": 20000,
      "step": 5,
      "help": "The plan area of permeable surfacing being laid."
    },
    {
      "id": "openAreaPercent",
      "label": "Open Area of the Units",
      "type": "number",
      "defaultValue": 10,
      "min": 2,
      "max": 40,
      "step": 0.5,
      "help": "The proportion of the surface made up of joints and apertures."
    },
    {
      "id": "jointDepth",
      "label": "Depth of Joint Fill",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.05,
      "min": 0.01,
      "max": 0.15,
      "step": 0.005,
      "help": "How deep the stone sits in the joint or aperture."
    },
    {
      "id": "bulkDensity",
      "label": "Loose Bulk Density of the Stone",
      "type": "number",
      "dimension": "density",
      "defaultValue": 1500,
      "min": 1200,
      "max": 1900,
      "step": 10,
      "help": "The delivered bulk density of the jointing aggregate."
    },
    {
      "id": "topUpPercent",
      "label": "Compaction Top-Up Allowance",
      "type": "number",
      "defaultValue": 15,
      "min": 0,
      "max": 50,
      "step": 1,
      "help": "Extra stone the joints take as the pavement is vibrated and refilled."
    },
    {
      "id": "replenishmentPercent",
      "label": "Replenishment per Maintenance Round",
      "type": "number",
      "defaultValue": 5,
      "min": 0,
      "max": 30,
      "step": 1,
      "help": "Proportion of the joint volume replaced at each cleaning cycle."
    }
  ],
  "sources": [
    {
      "label": "ASCE/T&DI 68-18, Permeable Interlocking Concrete Pavement, which covers the construction and the maintenance regime that makes joint replenishment a recurring quantity rather than a one-off"
    },
    {
      "label": "ASTM D448 defines the standard size numbers used for jointing and bedding aggregate in permeable pavements; the gradation chosen changes both the void structure and the bulk density entered here"
    },
    {
      "label": "The top-up and replenishment percentages are rules of thumb, not published figures — the joints take more stone during compaction than their nominal volume, and lose some at every cleaning cycle, by amounts that depend on the unit, the plant and the site"
    }
  ],
  "testCases": [
    {
      "name": "100 m² at 10% open area, 50 mm deep, 1500 kg/m³, 15% top-up",
      "inputs": {
        "laidArea": 100,
        "openAreaPercent": 10,
        "jointDepth": 0.05,
        "bulkDensity": 1500,
        "topUpPercent": 15,
        "replenishmentPercent": 5
      },
      "expected": 862.5,
      "toleranceDecimalPlaces": 2,
      "unit": "kg",
      "confidence": "medium",
      "steps": [
        {
          "label": "Loose stone volume in the joints",
          "value": 0.5,
          "unit": "m³"
        },
        {
          "label": "Stone before the compaction allowance",
          "value": 750,
          "unit": "kg"
        },
        {
          "label": "Stone for each replenishment round",
          "value": 37.5,
          "unit": "kg"
        },
        {
          "label": "First fill plus one replenishment round",
          "value": 899.9999999999999,
          "unit": "kg"
        }
      ],
      "includesAllowance": {
        "label": "Compaction top-up allowance",
        "percent": 15
      },
      "basis": "ambiguous"
    },
    {
      "name": "450 m² at 8.5% open area, 40 mm deep, 1600 kg/m³, 20% top-up",
      "inputs": {
        "laidArea": 450,
        "openAreaPercent": 8.5,
        "jointDepth": 0.04,
        "bulkDensity": 1600,
        "topUpPercent": 20,
        "replenishmentPercent": 8
      },
      "expected": 2937.6,
      "toleranceDecimalPlaces": 1,
      "unit": "kg",
      "confidence": "medium",
      "steps": [
        {
          "label": "Loose stone volume in the joints",
          "value": 1.53,
          "unit": "m³"
        },
        {
          "label": "Stone before the compaction allowance",
          "value": 2448,
          "unit": "kg"
        },
        {
          "label": "Stone for each replenishment round",
          "value": 195.84,
          "unit": "kg"
        },
        {
          "label": "First fill plus one replenishment round",
          "value": 3133.44,
          "unit": "kg"
        }
      ],
      "includesAllowance": {
        "label": "Compaction top-up allowance",
        "percent": 20
      },
      "basis": "ambiguous"
    }
  ]
}
