{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "material-waste-cost-calculator",
  "category": "financial-adjacent",
  "title": "Material Waste Cost Calculator",
  "description": "Find the total material budget needed after accounting for a waste percentage.",
  "url": "https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/material-waste-cost-calculator.json",
  "inputCount": 2,
  "testCaseCount": 2,
  "sourceCount": 1,
  "lastVerified": "2026-09-05",
  "translations": {
    "es-US": "https://craftquantities.com/es/calculators/financial-adjacent/material-waste-cost-calculator/"
  },
  "citation": {
    "author": "Craft Quantities",
    "title": "Material Waste Cost Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-05",
    "url": "https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Material Waste Cost Calculator. Version 1.0.1. Sources checked 2026-09-05. https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/",
      "apa": "Craft Quantities. (2026). Material Waste Cost Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/",
      "harvard": "Craft Quantities (2026) Material Waste Cost Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/",
      "bibtex": "@misc{craftquantities-calculators-financial-adjacent-material-waste-cost-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Material Waste Cost Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/financial-adjacent/material-waste-cost-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "materialCost",
      "label": "Material Cost (Exact Quantity)",
      "type": "number",
      "defaultValue": 5000,
      "min": 1,
      "max": 500000,
      "step": 50,
      "help": "The cost for the exact quantity your project needs, with no extra.",
      "money": {
        "role": "amount"
      }
    },
    {
      "id": "wastePercent",
      "label": "Waste Allowance (%)",
      "type": "number",
      "defaultValue": 10,
      "min": 0,
      "max": 50,
      "step": 1,
      "help": "The extra percentage to budget for material waste."
    }
  ],
  "sources": [
    {
      "label": "Total cost with waste = material cost x (1 + waste percent / 100)"
    }
  ],
  "testCases": [
    {
      "name": "$5000 material, 10% waste",
      "inputs": {
        "materialCost": 5000,
        "wastePercent": 10
      },
      "expected": 5500,
      "toleranceDecimalPlaces": 0,
      "unit": "$ (total budget)",
      "confidence": "high",
      "steps": [
        {
          "label": "Waste cost",
          "value": 500,
          "unit": "$"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    },
    {
      "name": "$8000 material, 15% waste",
      "inputs": {
        "materialCost": 8000,
        "wastePercent": 15
      },
      "expected": 9200,
      "toleranceDecimalPlaces": 0,
      "unit": "$ (total budget)",
      "confidence": "high",
      "steps": [
        {
          "label": "Waste cost",
          "value": 1200,
          "unit": "$"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    }
  ]
}
