{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "heated-screed-volume-calculator",
  "category": "materials-quantities",
  "title": "Heated Screed Volume Calculator",
  "description": "Screed quantity for an underfloor heating build-up, taking the cover over the tube crown and subtracting what the tube itself displaces.",
  "url": "https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/heated-screed-volume-calculator.json",
  "inputCount": 7,
  "testCaseCount": 3,
  "sourceCount": 3,
  "lastVerified": "2026-09-02",
  "translations": {
    "es-US": "https://craftquantities.com/es/calculators/materials-quantities/heated-screed-volume-calculator/"
  },
  "citation": {
    "author": "Craft Quantities",
    "title": "Heated Screed Volume Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-02",
    "url": "https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Heated Screed Volume Calculator. Version 1.0.1. Sources checked 2026-09-02. https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/",
      "apa": "Craft Quantities. (2026). Heated Screed Volume Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/",
      "harvard": "Craft Quantities (2026) Heated Screed Volume Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-heated-screed-volume-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Heated Screed Volume Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "floorArea",
      "label": "Heated Floor Area",
      "type": "number",
      "dimension": "area",
      "defaultValue": 80,
      "min": 1,
      "max": 1000,
      "step": 1,
      "help": "The floor area the screed covers."
    },
    {
      "id": "coverDepth",
      "label": "Cover Over the Tube Crown",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.045,
      "min": 0.015,
      "max": 0.15,
      "step": 0.001,
      "help": "Screed depth measured from the top of the tube to the finished surface."
    },
    {
      "id": "tubeOuterDiameter",
      "label": "Tube Outside Diameter",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.016,
      "min": 0.008,
      "max": 0.032,
      "step": 0.001,
      "help": "Outside diameter of the heating tube itself."
    },
    {
      "id": "tubeCentres",
      "label": "Tube Centres",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.15,
      "min": 0.075,
      "max": 0.4,
      "step": 0.005,
      "help": "Centre-to-centre spacing of the tube runs across the floor."
    },
    {
      "id": "screedDensity",
      "label": "Hardened Screed Density",
      "type": "number",
      "dimension": "density",
      "defaultValue": 2100,
      "min": 1200,
      "max": 2500,
      "step": 25,
      "help": "Density of the hardened screed mix being placed."
    },
    {
      "id": "bagYield",
      "label": "Yield per Bag",
      "type": "number",
      "dimension": "volume",
      "defaultValue": 13,
      "min": 5,
      "max": 40,
      "step": 0.5,
      "help": "The finished volume one bag makes up, taken from the bag itself."
    },
    {
      "id": "wasteAllowance",
      "label": "Waste Allowance (%)",
      "type": "number",
      "defaultValue": 10,
      "min": 0,
      "max": 30,
      "step": 1,
      "help": "Extra for an uneven substrate, spillage and the mixer's leavings."
    }
  ],
  "sources": [
    {
      "label": "Gross volume = floor area × (cover over the tube crown + tube outside diameter). Displaced volume = π/4 × diameter² × total tube length, with tube length taken as area ÷ tube centres. Net screed is the difference, before the waste allowance."
    },
    {
      "label": "BS 8204, Screeds, bases and in-situ floorings — the series covering screed thickness, strength and soundness over a heated build-up"
    },
    {
      "label": "EN 1264, Water-based surface embedded heating and cooling systems — where the required cover over the tube comes from; take the figure from it or from the system supplier rather than assuming one here"
    }
  ],
  "testCases": [
    {
      "name": "80 m² at 45 mm cover, 16 mm tube on 150 mm centres",
      "inputs": {
        "floorArea": 80,
        "coverDepth": 0.045,
        "tubeOuterDiameter": 0.016,
        "tubeCentres": 0.15,
        "screedDensity": 2100,
        "bagYield": 13,
        "wasteAllowance": 10
      },
      "expected": 5.25,
      "toleranceDecimalPlaces": 2,
      "unit": "m³",
      "confidence": "high",
      "steps": [
        {
          "label": "Screed thickness over the substrate",
          "value": 61,
          "unit": "mm"
        },
        {
          "label": "Volume before the tube displacement is taken out",
          "value": 4.88,
          "unit": "m³"
        },
        {
          "label": "Volume displaced by the tube",
          "value": 0.10723302924253161,
          "unit": "m³"
        },
        {
          "label": "Length of tube in the floor",
          "value": 533.3333333333334,
          "unit": "m"
        },
        {
          "label": "Screed mass at the density entered",
          "value": 11.025091702449751,
          "unit": "tonnes"
        },
        {
          "label": "Bags to order",
          "value": 404,
          "unit": "bags"
        }
      ],
      "includesAllowance": {
        "label": "Substrate tolerance and waste allowance",
        "percent": 10
      },
      "basis": "ambiguous"
    },
    {
      "name": "120 m² at 50 mm cover, 20 mm tube on 200 mm centres, no waste",
      "inputs": {
        "floorArea": 120,
        "coverDepth": 0.05,
        "tubeOuterDiameter": 0.02,
        "tubeCentres": 0.2,
        "screedDensity": 2100,
        "bagYield": 13,
        "wasteAllowance": 0
      },
      "expected": 8.2115,
      "toleranceDecimalPlaces": 2,
      "unit": "m³",
      "confidence": "high",
      "steps": [
        {
          "label": "Screed thickness over the substrate",
          "value": 70,
          "unit": "mm"
        },
        {
          "label": "Volume before the tube displacement is taken out",
          "value": 8.4,
          "unit": "m³"
        },
        {
          "label": "Volume displaced by the tube",
          "value": 0.18849555921538763,
          "unit": "m³"
        },
        {
          "label": "Length of tube in the floor",
          "value": 600,
          "unit": "m"
        },
        {
          "label": "Screed mass at the density entered",
          "value": 17.244159325647683,
          "unit": "tonnes"
        },
        {
          "label": "Bags to order",
          "value": 632,
          "unit": "bags"
        }
      ],
      "includesAllowance": {
        "label": "Substrate tolerance and waste allowance",
        "percent": 0
      },
      "basis": "ambiguous"
    },
    {
      "name": "Small bathroom zone, tight 100 mm centres",
      "inputs": {
        "floorArea": 30,
        "coverDepth": 0.065,
        "tubeOuterDiameter": 0.016,
        "tubeCentres": 0.1,
        "screedDensity": 2000,
        "bagYield": 13,
        "wasteAllowance": 5
      },
      "expected": 2.4882,
      "toleranceDecimalPlaces": 2,
      "unit": "m³",
      "confidence": "high",
      "steps": [
        {
          "label": "Screed thickness over the substrate",
          "value": 81,
          "unit": "mm"
        },
        {
          "label": "Volume before the tube displacement is taken out",
          "value": 2.43,
          "unit": "m³"
        },
        {
          "label": "Volume displaced by the tube",
          "value": 0.060318578948924034,
          "unit": "m³"
        },
        {
          "label": "Length of tube in the floor",
          "value": 300,
          "unit": "m"
        },
        {
          "label": "Screed mass at the density entered",
          "value": 4.9763309842072605,
          "unit": "tonnes"
        },
        {
          "label": "Bags to order",
          "value": 192,
          "unit": "bags"
        }
      ],
      "includesAllowance": {
        "label": "Substrate tolerance and waste allowance",
        "percent": 5
      },
      "basis": "ambiguous"
    }
  ],
  "usedByAssemblies": [
    {
      "id": "underfloor-heating-retrofit",
      "name": "Wet underfloor heating in an existing floor"
    }
  ]
}
