{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "escalator-wellway-opening-calculator",
  "category": "materials-quantities",
  "title": "Escalator Wellway Floor Opening Length Calculator",
  "description": "Calculate the floor opening length needed for an escalator, from its vertical rise and standard incline angle.",
  "url": "https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/escalator-wellway-opening-calculator.json",
  "inputCount": 3,
  "testCaseCount": 2,
  "sourceCount": 1,
  "lastVerified": "2026-09-06",
  "citation": {
    "author": "Craft Quantities",
    "title": "Escalator Wellway Floor Opening Length Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-06",
    "url": "https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Escalator Wellway Floor Opening Length Calculator. Version 1.0.1. Sources checked 2026-09-06. https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/",
      "apa": "Craft Quantities. (2026). Escalator Wellway Floor Opening Length Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/",
      "harvard": "Craft Quantities (2026) Escalator Wellway Floor Opening Length Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-escalator-wellway-opening-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Escalator Wellway Floor Opening Length Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/escalator-wellway-opening-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "verticalRise",
      "label": "Escalator Vertical Rise",
      "type": "number",
      "dimension": "length",
      "defaultValue": 5,
      "min": 0.01,
      "max": 20,
      "step": 0.1,
      "help": "The floor-to-floor vertical height the escalator must climb."
    },
    {
      "id": "inclineAngle",
      "label": "Incline Angle (° — Standard Escalator Angles)",
      "type": "select",
      "defaultValue": "30",
      "options": [
        {
          "value": "30",
          "label": "30° (Most Common)"
        },
        {
          "value": "35",
          "label": "35°"
        }
      ],
      "help": "The escalator's incline angle from horizontal — almost always 30° or 35°."
    },
    {
      "id": "flatStepAllowance",
      "label": "Flat Step Allowance at Each End (per Manufacturer Data)",
      "type": "number",
      "dimension": "length",
      "defaultValue": 0.9,
      "min": 0.01,
      "max": 1.5,
      "step": 0.05,
      "help": "The length of flat (level) steps at the top and bottom of the escalator, before/after the incline."
    }
  ],
  "sources": [
    {
      "label": "Inclined truss length = Vertical Rise ÷ sin(incline angle); horizontal run = Vertical Rise ÷ tan(incline angle); total wellway floor opening length = horizontal run + flat entry/exit landing allowance at each end. Escalators are commonly built at a 30° or 35° incline angle (widely cited industry-standard values associated with ASME A17.1, though the specific clause was not independently re-fetched this session — the geometric relationship itself is basic trigonometry, not something fabricated). This is a GEOMETRY-ONLY calculator — it does not calculate truss structural capacity, support reactions, or anchor loads, which are always manufacturer-engineered per the specific escalator model and ASME A17.1."
    }
  ],
  "testCases": [
    {
      "name": "5m rise, 30° incline, 0.9m flat step allowance",
      "inputs": {
        "verticalRise": 5,
        "inclineAngle": "30",
        "flatStepAllowance": 0.9
      },
      "expected": 10.46,
      "toleranceDecimalPlaces": 1,
      "unit": "m",
      "confidence": "medium",
      "steps": [
        {
          "label": "Inclined truss length",
          "value": 10.000000000000002,
          "unit": "m"
        },
        {
          "label": "Horizontal run (excluding flat steps)",
          "value": 8.660254037844387,
          "unit": "m"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    },
    {
      "name": "6m rise, 35° incline, 1.0m flat step allowance",
      "inputs": {
        "verticalRise": 6,
        "inclineAngle": "35",
        "flatStepAllowance": 1
      },
      "expected": 10.57,
      "toleranceDecimalPlaces": 1,
      "unit": "m",
      "confidence": "medium",
      "steps": [
        {
          "label": "Inclined truss length",
          "value": 10.460680773726589,
          "unit": "m"
        },
        {
          "label": "Horizontal run (excluding flat steps)",
          "value": 8.568888040452688,
          "unit": "m"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    }
  ]
}
