{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "dust-suppression-water-calculator",
  "category": "materials-quantities",
  "title": "Jobsite Dust Suppression Water Truck Application Calculator",
  "description": "Calculate the total water volume and number of water truck loads needed to apply dust suppression across a jobsite area.",
  "url": "https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/dust-suppression-water-calculator.json",
  "inputCount": 3,
  "testCaseCount": 2,
  "sourceCount": 1,
  "lastVerified": "2026-09-06",
  "citation": {
    "author": "Craft Quantities",
    "title": "Jobsite Dust Suppression Water Truck Application Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-06",
    "url": "https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Jobsite Dust Suppression Water Truck Application Calculator. Version 1.0.1. Sources checked 2026-09-06. https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/",
      "apa": "Craft Quantities. (2026). Jobsite Dust Suppression Water Truck Application Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/",
      "harvard": "Craft Quantities (2026) Jobsite Dust Suppression Water Truck Application Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-dust-suppression-water-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Jobsite Dust Suppression Water Truck Application Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/dust-suppression-water-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "applicationRate",
      "label": "Application Rate",
      "type": "number",
      "dimension": "applicationrate",
      "defaultValue": 2,
      "min": 0.2,
      "max": 10,
      "step": 0.1,
      "help": "How much water to apply per unit of treated surface — US dust-control plans usually state this in gal/yd²."
    },
    {
      "id": "treatmentArea",
      "label": "Area to be Treated",
      "type": "number",
      "dimension": "area",
      "defaultValue": 5000,
      "min": 0.01,
      "max": 500000,
      "step": 50,
      "help": "The total jobsite surface area requiring dust suppression."
    },
    {
      "id": "truckCapacity",
      "label": "Water Truck Tank Capacity",
      "type": "number",
      "dimension": "volume",
      "defaultValue": 7570.8,
      "min": 0.1,
      "max": 45000,
      "step": 100,
      "help": "The usable tank capacity of the water truck being used."
    }
  ],
  "sources": [
    {
      "label": "Total water needed = Application Rate × Area to be Treated; Truck loads needed = ceil(Total Water ÷ Truck Tank Capacity). Dust suppression application rates vary with soil type, moisture content, wind, and site conditions — the specific rate should come from your site's dust control plan or environmental compliance requirements, not a single universal constant."
    }
  ],
  "testCases": [
    {
      "name": "5,000 m² at 2 L/m², 7,570.8 L truck",
      "inputs": {
        "applicationRate": 2,
        "treatmentArea": 5000,
        "truckCapacity": 7570.8
      },
      "expected": 10000,
      "toleranceDecimalPlaces": 0,
      "unit": "L",
      "confidence": "medium",
      "steps": [
        {
          "label": "Water truck loads needed",
          "value": 2,
          "unit": "loads"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    },
    {
      "name": "10,000 m² at 1.5 L/m², 10,000 L truck",
      "inputs": {
        "applicationRate": 1.5,
        "treatmentArea": 10000,
        "truckCapacity": 10000
      },
      "expected": 15000,
      "toleranceDecimalPlaces": 0,
      "unit": "L",
      "confidence": "medium",
      "steps": [
        {
          "label": "Water truck loads needed",
          "value": 2,
          "unit": "loads"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    }
  ]
}
