{
  "version": "v1",
  "source": "https://craftquantities.com",
  "licence": "CC BY 4.0",
  "licenceUrl": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Craft Quantities — craftquantities.com",
  "documentation": "https://craftquantities.com/api/",
  "versioning": "Fields are added, never removed or repurposed, within a version. A breaking change becomes /api/v2/ and v1 keeps being built.",
  "slug": "cut-fill-earthwork-balance-calculator",
  "category": "materials-quantities",
  "title": "Slope Cut-and-Fill Earthwork Balance Calculator",
  "description": "Check whether a site's cut material (adjusted for shrinkage) covers its fill requirement, or whether you need to import or haul off material.",
  "url": "https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/",
  "json": "https://craftquantities.com/api/v1/calculators/cut-fill-earthwork-balance-calculator.json",
  "inputCount": 3,
  "testCaseCount": 2,
  "sourceCount": 1,
  "lastVerified": "2026-09-02",
  "translations": {
    "es-US": "https://craftquantities.com/es/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/"
  },
  "citation": {
    "author": "Craft Quantities",
    "title": "Slope Cut-and-Fill Earthwork Balance Calculator",
    "version": "1.0.1",
    "sourcesChecked": "2026-09-02",
    "url": "https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/",
    "accessDate": null,
    "accessDateNote": "Add the date you retrieved this. It is deliberately absent: a static file cannot know when you read it, and the build date would be wrong.",
    "permanentVersionedUrl": null,
    "permanentVersionedUrlNote": "Not offered. This site keeps no archive of previous builds, so any such URL would resolve to the current page or to nothing. The version and sourcesChecked fields identify the calculation instead.",
    "formats": {
      "plain": "Craft Quantities. Slope Cut-and-Fill Earthwork Balance Calculator. Version 1.0.1. Sources checked 2026-09-02. https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/",
      "apa": "Craft Quantities. (2026). Slope Cut-and-Fill Earthwork Balance Calculator (Version 1.0.1) [Web calculator]. Retrieved from https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/",
      "harvard": "Craft Quantities (2026) Slope Cut-and-Fill Earthwork Balance Calculator (Version 1.0.1). Available at: https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/",
      "bibtex": "@misc{craftquantities-calculators-materials-quantities-cut-fill-earthwork-balance-calculator,\n  author       = {{Craft Quantities}},\n  title        = {Slope Cut-and-Fill Earthwork Balance Calculator},\n  version      = {1.0.1},\n  year         = {2026},\n  howpublished = {\\url{https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/}},\n}"
    }
  },
  "inputs": [
    {
      "id": "cutVolume",
      "label": "Cut Volume (Bank Measure)",
      "type": "number",
      "defaultValue": 1000,
      "min": 10,
      "max": 100000,
      "step": 10,
      "help": "The in-situ (undisturbed) volume of soil to be cut, in m³."
    },
    {
      "id": "fillVolume",
      "label": "Required Fill Volume (Compacted)",
      "type": "number",
      "defaultValue": 800,
      "min": 10,
      "max": 100000,
      "step": 10,
      "help": "The compacted volume needed to build up the fill areas, in m³."
    },
    {
      "id": "shrinkageFactorPercent",
      "label": "Shrinkage or Bulking (%)",
      "type": "number",
      "defaultValue": -10,
      "min": -25,
      "max": 35,
      "step": 1,
      "help": "How the compacted fill volume compares with the bank volume it came from. Negative shrinks, positive bulks."
    }
  ],
  "sources": [
    {
      "label": "Standard earthwork balance: cut volume (bank/in-situ measure) converts to a smaller compacted fill volume via a shrinkage factor; comparing that to the required fill volume gives a net surplus (haul off-site) or deficit (import fill)"
    }
  ],
  "testCases": [
    {
      "name": "1000m³ cut, 800m³ fill, -10% shrinkage (surplus)",
      "inputs": {
        "cutVolume": 1000,
        "fillVolume": 800,
        "shrinkageFactorPercent": -10
      },
      "expected": 100,
      "toleranceDecimalPlaces": 0,
      "unit": "m³",
      "confidence": "medium",
      "steps": [
        {
          "label": "Cut volume as compacted fill",
          "value": 900,
          "unit": "m³"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    },
    {
      "name": "500m³ cut, 700m³ fill, -12% shrinkage (deficit)",
      "inputs": {
        "cutVolume": 500,
        "fillVolume": 700,
        "shrinkageFactorPercent": -12
      },
      "expected": -260,
      "toleranceDecimalPlaces": 0,
      "unit": "m³",
      "confidence": "medium",
      "steps": [
        {
          "label": "Cut volume as compacted fill",
          "value": 440,
          "unit": "m³"
        }
      ],
      "basis": "sole-source",
      "sourceIndex": 0
    }
  ]
}
