# Estimating a small job

> Quantities from the drawing, a rate you can explain, allowances for what is not yet known, and a quotation that survives the first variation.

Page: https://craftquantities.com/academy/estimating-a-small-job/ (page). This is the page's Markdown copy; the HTML page is the canonical version.

An estimate is a chain: quantities, then rates, then the allowances and the margin, then the written quotation that sets out what is and is not included. A weak link anywhere shows up later as an argument.

This path follows the chain in order. The figures are always your own: the site never supplies prices, only the arithmetic and the questions to ask before you commit to a number.

- 8 Steps in order
- 2 h 23 min Reading and trying
- 1 Guides with an animated demo

## The path, in order

0 of 8 done

1. Guide · 19 min · animated demo

   ### [Taking Off Quantities From a Drawing Set](https://craftquantities.com/guides/how-to-take-off-quantities-from-drawings/)

   Every price rests on a quantity someone can check.
2. Guide · 20 min

   ### [Building Up a Unit Rate](https://craftquantities.com/guides/how-to-build-up-a-unit-rate/)

   Turning your own costs into a rate per square metre, per metre or per item.
3. Calculator · 4 min

   ### [Labor Cost Calculator](https://craftquantities.com/calculators/financial-adjacent/labor-cost-calculator/)

   Your crew's hours into a labour figure, with your own rates.
4. Guide · 20 min

   ### [Provisional Sums, PC Sums and Allowances](https://craftquantities.com/guides/how-to-price-provisional-sums-and-allowances/)

   Naming what is not yet known instead of hiding it in the rate.
5. Guide · 23 min

   ### [Pricing the Preliminaries on a Tender](https://craftquantities.com/guides/how-to-price-preliminaries/)

   The site costs that belong to the job, not to any one item.
6. Guide · 21 min

   ### [Writing a Quotation That Holds](https://craftquantities.com/guides/how-to-write-a-quotation/)

   The document the client signs: scope, exclusions, terms.
7. Guide · 18 min

   ### [Pricing a Variation Before It Is Instructed](https://craftquantities.com/guides/how-to-price-a-variation/)

   The first change will come; price it the way the quotation was priced.
8. Guide · 18 min

   ### [Knowing Whether a Job Is Ahead or Behind](https://craftquantities.com/guides/how-to-track-a-job-against-its-budget/)

   Closing the loop, so the next estimate learns from this job.

Your ticks stay in this browser and nowhere else. The printed sheet is a personal record of what you read, not a certificate or a qualification.

## What you’ll be able to do

- Take quantities off a drawing and keep them traceable
- Build a unit rate from labour, plant and materials
- Price provisional sums and allowances honestly
- Write a quotation with clear inclusions and exclusions
- Price a variation and track the job against its budget

## Other paths

- [Managing a builder](https://craftquantities.com/academy/managing-a-builder/)
- [Concrete basics](https://craftquantities.com/academy/concrete-basics/)
- [Finishing a room](https://craftquantities.com/academy/finishing-a-room/)
- [Fit-out cutting](https://craftquantities.com/academy/fit-out-cutting/)
- [Every path](https://craftquantities.com/academy/)

---
Source: https://craftquantities.com/academy/estimating-a-small-job/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.